Stormwater Calculator

Size a storage tank, pipe rows, chambers or seepage pits for a New Jersey site. Every design is checked against all six storms the rules require — the current and the projected (future) 2-, 10- and 100-year storms — using the same NRCS hydrograph method an engineer's software uses. How it works · ← All tools

1

Site

Where the project is decides which rainfall and which rules apply. Looking up the address fills in the county, town, soil and the exact-site rainfall.

Soil group hydrologic soil group

What kind of project is this?

  • Major development: a larger project; the full standard applies: six design storms, pre- and post-construction.
  • Minor development: a smaller project; in Newark it is sized for the 10-year storm by a simpler method (Modified Rational).
  • Not sure: the calculator decides from the lot, the work and the surfaces you enter. See the thresholds.
The thresholds
Newark (§41:17-2). Major development: 10,000 SF or more of ground disturbed; or 5,000 SF or more of new impervious (hard) surface; or 5,000 SF or more of new motor-vehicle surface; or new hard surface and new motor-vehicle surface that add up to 5,000 SF (each surface counted once). Minor development: the project needs site plan or subdivision approval, or adds 250 SF or more of hard surface.
State (N.J.A.C. 7:8-1.2). Major development is any one of:
  • 1 acre (43,560 SF) or more of ground disturbed;
  • a quarter acre (10,890 SF) or more of new regulated impervious surface;
  • a quarter acre or more of new regulated motor-vehicle surface;
  • a quarter acre or more of rebuilt impervious or motor-vehicle surface;
  • the last three together adding up to a quarter acre, no surface counted twice.

The lot and the work

Enter any two of area, width and depth; the third fills in.
Usually the whole lot on a new building.
Is existing paving or roof being torn out and rebuilt? reconstruction
Leave blank if none. Existing hard surface that did not drain to a pipe before counts toward the thresholds once it does.
Does the project need site plan or subdivision approval?
In Newark this alone makes a project minor development (§41:17-2).
Rules
To check a minor project against the stricter full major-development standard, answer Major development above.
2

Storms

New Jersey requires six design storms: the 2-, 10- and 100-year storms at today's rainfall (current, Table 5-5) and at the rainfall expected for 2050–2099 (projected, Table 5-6). All six are always run; the projected storms usually decide the size.

Rainfall source
Rain pattern and time step
How often the calculator steps through each storm. Shorter steps are more exact for roofs and paving, which drain in a minute or two, and a little slower.
3

Surfaces

List what covers the lot pre- and post-construction. Each surface is modeled separately, as the state rule requires (N.J.A.C. 7:8-5.7(a)4). Uncheck To system for areas that drain straight to the street, and tick Cars for surfaces that cars drive or park on.

Has the existing ground cover been in place for five years or more?
How much runs off: CN (NRCS curve number) and C (Rational runoff coefficient) both measure how much of the rain runs off instead of soaking in; the minutes are how long water takes to reach the drain.

How water travels across the site

4

Storage system

Choose what holds the water back. Enter a size, or let the calculator find the smallest one that meets every storm.

A Green Stories margin, not a code requirement. Enter 0 to size to the code minimum.
5

Outlet

Openings in the outlet structure let water out slowly. The lowest one handles the small storms; higher ones start working only in bigger storms. Heights are measured from the floor of the storage system.

Proposes the openings, an overflow near the top and the outlet pipe. Nothing changes until you choose Use this design.
An overflow slot (weir) is a wide opening near the top of the outlet structure that lets big storms out.

Outlet pipe to the sewer or street

Smoother pipe carries more water. Manning n: HDPE 0.012 · PVC 0.010 · concrete 0.013
6

Elevations

Optional. With a few elevations the calculator checks soil cover, groundwater separation and whether the outlet pipe can drain to the sewer by gravity. Leave any field blank to skip its check.

From the soil borings.

Where the outlet pipe goes

→

Results

7

Report

A printable study in the order an engineer's stormwater report uses: site, rules, method, rainfall, surfaces, storage and outlet, results, drawings and maintenance notes. Print it or save it as a PDF from the preview.

These calculations are preliminary estimates for design and coordination. They follow N.J.A.C. 7:8 (amended January 20, 2026), the NJ Stormwater BMP Manual and Newark §41:17, but they do not replace analysis and certification by a licensed professional engineer. Green Stories LLC is a building design and consulting firm; projects that require a licensed professional are completed with registered design professionals.