Stormwater Calculator v2
Rational method runoff, detention/infiltration sizing, orifice and overflow pipe sizing, 72-hr drain-down, and system elevation checks. NJAC 7:8 (Jan 2026) county-based rainfall.
← Back to Tools
Site Location
County & Township
County selection pre-populates 24-hour rainfall depths from NRCS Table 5-2 and applies NJAC 7:8 Tables 5-5/5-6 adjustment factors. Township auto-fills GSR-32 climate factor.
Jurisdiction
Newark §41:17 extends stormwater requirements to all site plans and subdivisions, including non-major (minor) development.
Development Type
Newark Ordinance §41:17. Minor development uses the 10-year storm; major uses the 100-year storm. Major development per NJAC 7:8 §7:8-1.2: ≥1 acre disturbance or ≥0.25 acre new impervious.
System Type
Minor development only
Storm Event
Rainfall Source
Engineering Overrides
30% default per standard NJ infiltration practice (user-overridable)
TP vs TP/2: infiltration uses full storm duration (water accumulates while infiltrating over entire storm). Detention uses TP/2 (peak inflow to outflow lag, approximates triangular hydrograph). Standard NJ stormwater practice — exact source under verification.
Site Perc Rate
Raw tested value. FOS=2 applied automatically in sizing.
Site Areas
Existing
Leave blank = Lot - Bldg - Paved
Proposed
Leave blank = Lot - Bldg - Paved
Proposed — CN Composite (NRCS)
Auto-populated from proposed areas above. Adjust cover types and per-area HSG as needed. Areas should total to lot SF.
Runoff Coefficients
Site Conditions
Major development (NJAC 7:8)
Major Development — NJAC 7:8-5.6(b).
Analysis uses NRCS methodology per §7:8-5.7(a)(1). Rational Method is not permitted for major development.
Results are preliminary — final design requires full hydrograph routing (HydroCAD/WinTR-55).
Per NRCS Web Soil Survey. For mixed soils, use area-weighted assignment in the CN composite sections below.
TR-55 Table 4-2 adjustment factor Fp. Leave 0 if none.
Raw tested value in inches/hour. FOS=2 applied automatically in BMP and detention sizing.
Flags
Newark is entirely PA1 per §7:8-5.4(b)(2). Exempts GW recharge (Phase C).
§7:8-5.6(b)(4) — quantity check informational only.
Design Rainfall Depths (24-hr)
Pre-Construction Conditions
Per §7:8-5.7(a)(2), pre-construction is presumed woods/good condition unless site history documented for 5+ years without interruption.
Cover TypeArea (SF)HSGCN
Time of Concentration — Pre-Construction
Per NJ BMP Manual Ch. 5: no minimum Tc and no assumed Tc. Tc must be computed from actual flow path.
Time of Concentration — Post-Construction
Storm Analysis — 6-Storm Compliance
Water Quality & BMP Selection
Site Classification
WQDS Runoff
Water Quality Design Storm: 1.25 in / 2 hr, nonuniform distribution per NJAC 7:8 Table 5-4.
TSS Removal Target
BMP Treatment Train
BMP Sizing
Volumetric Retention (§7:8-5.6(d)1)
Detention Storage Sizing (TR-55 Ch. 6)
Method: TR-55 Ch. 6 Storage-Indication, Types II/III (Table F-2 polynomial). Safety factor: % (NJAC 7:8 2026 default: 30%).
Groundwater Recharge (GSR-32)
URA Exemption
Site Parameters
Auto-filled from County & Township above
Soil auto-filled from Site Address lookup above, or select manually from dropdown.
Pre-Development Cover
Post-Development Cover
Recharge Analysis
Recharge BMP Availability
Seepage Pit — Peerless Concrete
Percolation
HDPE Detention Pipe
SDR-35 Detention Pipe
NDS Flo-Well Drywell
24" dia × 24" tall, 50 gal (6.68 CF) per unit. Stackable up to 4 high or side-by-side 18" apart. Gravel around at ~40% void.
Percolation
NDS EZflow French Drain
NDS StormChamber
ADS StormTech
Installed storage assumes 40% stone porosity per ADS specifications.
Outflow Pipe Sizing
Minor development only
Outlet Control Structure
Sharp-edged orifice in a thin plate — Cd = 0.60 per NEH Part 650, Ch. 3 (standard sharp-edged circular orifice).
System Elevations
Minor development only
Grade at System Location
Inlet Pipe — Farthest Inlet to System
High Water Table
Outflow Connections
Enter available connection data below. The calculator will check gravity for each and show which options work.
Sewer Connection
Curb Connection
Outflow Selection
Enter elevation data and calculate to see which outflow options are available.
Results
These calculations provide preliminary estimates for stormwater management design. Verify all outputs against current adopted codes, local amendments, and project-specific conditions. This tool does not replace professional engineering analysis. Green Stories LLC is a building design and consulting firm. All projects requiring a licensed architect are completed in collaboration with registered design professionals.